US Bridges

IH 10 EB Off Ramp over Leon Creek (twice)

Good

Bexar County, Texas · 0.90 MI N of Lp 1604 · Structure no. 150150007208254

Built
1992
33 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
1,554 ft
9 main spans
Daily traffic
16,350
2013 count
Owner
State
State Highway Agency

About this bridge

IH 10 EB Off Ramp over Leon Creek (twice) is a prestressed concrete stringer/multi-beam or girder carrying IH 10 EB Off Ramp over Leon Creek (twice) in Bexar County, Texas. It was built in 1992, so it is 33 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,350 vehicles a day, roughly 5% of them trucks, projected to reach 22,890 by 2033. The structure is 1,554 ft (473.7 m) long and 30 ft wide.

CarriesIH 10 EB Off Ramp
CrossesLeon Creek (twice)
Location0.90 MI N of Lp 1604
RouteInterstate 10
StateTexas
Coordinates29.60359, -98.60157
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans9 (+6 approach)
Design loadHS 20
Structure length1,554 ft (473.7 m)
Longest span120 ft (36.6 m)
Deck width30 ft (9.1 m)
Roadway width29 ft (8.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,350 (2013)
Projected traffic22,890 by 2033
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IH 10 EB Off Ramp over Leon Creek (twice) built?

It was built in 1992, making it 33 years old in 2025.

What condition is IH 10 EB Off Ramp over Leon Creek (twice) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does IH 10 EB Off Ramp over Leon Creek (twice) carry?

About 16,350 vehicles per day (2013 count), of which roughly 5% are trucks.

How long is IH 10 EB Off Ramp over Leon Creek (twice)?

The structure is 1,554 ft (473.7 m) long with a longest span of 120 ft (36.6 m) and a deck 30 ft wide.

Who owns IH 10 EB Off Ramp over Leon Creek (twice)?

It is owned by the State Highway Agency.