US Bridges

Fair Oaks Parkway over IH 10

Good

Bexar County, Texas · 1.9 MI S of Kendall C/L · Structure no. 150150007207405

Built
2018
7 years old
Condition
Good
inspected August 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
257 ft
2 main spans
Daily traffic
76,800
2019 count
Owner
State
State Highway Agency

About this bridge

Fair Oaks Parkway over IH 10 is a prestressed concrete stringer/multi-beam or girder carrying Fair Oaks Parkway over IH 10 in Bexar County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 76,800 vehicles a day, roughly 3% of them trucks, projected to reach 1 by 1900. The structure is 257 ft (78.3 m) long and 86 ft wide.

CarriesFair Oaks Parkway
CrossesIH 10
Location1.9 MI S of Kendall C/L
RouteCity Street 1392
StateTexas
Coordinates29.71959, -98.66601
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionAugust 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadHL 93
Structure length257 ft (78.3 m)
Longest span129 ft (39.3 m)
Deck width86 ft (26.1 m)
Roadway width70 ft (21.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic76,800 (2019)
Projected traffic1 by 1900
Trucks3%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Fair Oaks Parkway over IH 10 built?

It was built in 2018, making it 7 years old in 2025.

What condition is Fair Oaks Parkway over IH 10 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2022.

How much traffic does Fair Oaks Parkway over IH 10 carry?

About 76,800 vehicles per day (2019 count), of which roughly 3% are trucks.

How long is Fair Oaks Parkway over IH 10?

The structure is 257 ft (78.3 m) long with a longest span of 129 ft (39.3 m) and a deck 86 ft wide.

Who owns Fair Oaks Parkway over IH 10?

It is owned by the State Highway Agency.