IH10 WB & EB Mls over Salitrillo Creek
GoodBexar County, Texas · 1.41 MI NE of Sl 1604 · Structure no. 150150002502324
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 230 ft
- 2 main spans
- Daily traffic
- 24,987
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
IH10 WB & EB Mls over Salitrillo Creek is a prestressed concrete stringer/multi-beam or girder carrying IH10 WB & EB Mls over Salitrillo Creek in Bexar County, Texas. It was built in 2023, so it is 2 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 24,987 vehicles a day, roughly 34% of them trucks, projected to reach 1 by 2042. The structure is 230 ft (70.1 m) long and 136 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH10 WB & EB Mls over Salitrillo Creek built?
It was built in 2023, making it 2 years old in 2025.
What condition is IH10 WB & EB Mls over Salitrillo Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does IH10 WB & EB Mls over Salitrillo Creek carry?
About 24,987 vehicles per day (2022 count), of which roughly 34% are trucks.
How long is IH10 WB & EB Mls over Salitrillo Creek?
The structure is 230 ft (70.1 m) long with a longest span of 115 ft (35.1 m) and a deck 136 ft wide.
Who owns IH10 WB & EB Mls over Salitrillo Creek?
It is owned by the State Highway Agency.