IH 10 over San Pedro Creek
FairBexar County, Texas · 0.6 MI E of IH 35 · Structure no. 150150002502151
- Built
- 1967
- 58 years old, rebuilt 1987
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 460 ft
- 3 main spans
- Daily traffic
- 154,438
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
IH 10 over San Pedro Creek is a steel continuous stringer/multi-beam or girder carrying IH 10 over San Pedro Creek in Bexar County, Texas. It was built in 1967 and reconstructed in 1987, so it is 58 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 154,438 vehicles a day, roughly 10% of them trucks, projected to reach 194,592 by 2042. The structure is 460 ft (140.2 m) long and 148 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 10 over San Pedro Creek built?
It was built in 1967, making it 58 years old in 2025. It was reconstructed in 1987.
What condition is IH 10 over San Pedro Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does IH 10 over San Pedro Creek carry?
About 154,438 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is IH 10 over San Pedro Creek?
The structure is 460 ft (140.2 m) long with a longest span of 90 ft (27.4 m) and a deck 148 ft wide.
Who owns IH 10 over San Pedro Creek?
It is owned by the State Highway Agency.