N Pine ST over IH 35 Ml S Conn 7
FairBexar County, Texas · 0.5 MI E of IH 37/US 281 · Structure no. 150150001710164
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 278 ft
- 2 main spans
- Daily traffic
- 1,227
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
N Pine ST over IH 35 Ml S Conn 7 is a steel continuous stringer/multi-beam or girder carrying N Pine ST over IH 35 Ml S Conn 7 in Bexar County, Texas. It was built in 1962, so it is 63 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,227 vehicles a day, roughly 3% of them trucks, projected to reach 1,718 by 2042. The structure is 278 ft (84.7 m) long and 64 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N Pine ST over IH 35 Ml S Conn 7 built?
It was built in 1962, making it 63 years old in 2025.
What condition is N Pine ST over IH 35 Ml S Conn 7 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does N Pine ST over IH 35 Ml S Conn 7 carry?
About 1,227 vehicles per day (2020 count), of which roughly 3% are trucks.
How long is N Pine ST over IH 35 Ml S Conn 7?
The structure is 278 ft (84.7 m) long with a longest span of 82 ft (25 m) and a deck 64 ft wide.
Who owns N Pine ST over IH 35 Ml S Conn 7?
It is owned by the State Highway Agency.