US Bridges

SH 36 over West Pepper Creek

Good

Bell County, Texas · 1.18 MI NW of Lp 363 · Structure no. 090140018403048

Built
1997
28 years old
Condition
Good
inspected January 2023
Type
Culvert
Concrete
Length
64 ft
6 main spans
Daily traffic
24,232
2023 count
Owner
State
State Highway Agency

About this bridge

SH 36 over West Pepper Creek is a concrete culvert carrying SH 36 over West Pepper Creek in Bell County, Texas. It was built in 1997, so it is 28 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 24,232 vehicles a day, roughly 17% of them trucks, projected to reach 21,550 by 2036. The structure is 64 ft (19.5 m) long and 86 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesSH 36
CrossesWest Pepper Creek
Location1.18 MI NW of Lp 363
RouteState Highway 36
StateTexas
Coordinates31.13004, -97.40083
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20
Structure length64 ft (19.5 m)
Longest span10 ft (3 m)
Deck width86 ft (26.2 m)
Roadway width83 ft (25.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic24,232 (2023)
Projected traffic21,550 by 2036
Trucks17%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 36 over West Pepper Creek built?

It was built in 1997, making it 28 years old in 2025.

What condition is SH 36 over West Pepper Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does SH 36 over West Pepper Creek carry?

About 24,232 vehicles per day (2023 count), of which roughly 17% are trucks.

How long is SH 36 over West Pepper Creek?

The structure is 64 ft (19.5 m) long with a longest span of 10 ft (3 m) and a deck 86 ft wide.

Who owns SH 36 over West Pepper Creek?

It is owned by the State Highway Agency.