US Bridges

IH 35 NB Off-Ramp over NB On-Ramp

Good

Bell County, Texas · 0.50 North of Spur 290 · Structure no. 090140001514711

Built
2019
6 years old
Condition
Good
inspected February 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
720 ft
6 main spans
Daily traffic
4,000
2015 count
Owner
State
State Highway Agency

About this bridge

IH 35 NB Off-Ramp over NB On-Ramp is a prestressed concrete stringer/multi-beam or girder carrying IH 35 NB Off-Ramp over NB On-Ramp in Bell County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,000 vehicles a day, roughly 2% of them trucks, projected to reach 1 by 1900. The structure is 720 ft (219.5 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIH 35 NB Off-Ramp
CrossesNB On-Ramp
Location0.50 North of Spur 290
RouteInterstate 35
StateTexas
Coordinates31.13136, -97.33254
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans6
Design loadHL 93
Structure length720 ft (219.5 m)
Longest span120 ft (36.6 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,000 (2015)
Projected traffic1 by 1900
Trucks2%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 35 NB Off-Ramp over NB On-Ramp built?

It was built in 2019, making it 6 years old in 2025.

What condition is IH 35 NB Off-Ramp over NB On-Ramp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does IH 35 NB Off-Ramp over NB On-Ramp carry?

About 4,000 vehicles per day (2015 count), of which roughly 2% are trucks.

How long is IH 35 NB Off-Ramp over NB On-Ramp?

The structure is 720 ft (219.5 m) long with a longest span of 120 ft (36.6 m) and a deck 28 ft wide.

Who owns IH 35 NB Off-Ramp over NB On-Ramp?

It is owned by the State Highway Agency.