US Bridges

Lp 363 Ebml over IH 35 Ml & FR

Good

Bell County, Texas · Lp 363 Ebml at IH 35 · Structure no. 090140001514397

Built
2009
16 years old
Condition
Good
inspected January 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
571 ft
6 main spans
Daily traffic
51,500
2011 count
Owner
State
State Highway Agency

About this bridge

Lp 363 Ebml over IH 35 Ml & FR is a prestressed concrete box beam or girders - multiple carrying Lp 363 Ebml over IH 35 Ml & FR in Bell County, Texas. It was built in 2009, so it is 16 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 51,500 vehicles a day, roughly 5% of them trucks, projected to reach 87,600 by 2030. The structure is 571 ft (174 m) long and 59 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesLp 363 Ebml
CrossesIH 35 Ml & FR
LocationLp 363 Ebml at IH 35
RouteState Highway 363
StateTexas
Coordinates31.09124, -97.38755
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20
Structure length571 ft (174 m)
Longest span103 ft (31.4 m)
Deck width59 ft (18 m)
Roadway width57 ft (17.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic51,500 (2011)
Projected traffic87,600 by 2030
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lp 363 Ebml over IH 35 Ml & FR built?

It was built in 2009, making it 16 years old in 2025.

What condition is Lp 363 Ebml over IH 35 Ml & FR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does Lp 363 Ebml over IH 35 Ml & FR carry?

About 51,500 vehicles per day (2011 count), of which roughly 5% are trucks.

How long is Lp 363 Ebml over IH 35 Ml & FR?

The structure is 571 ft (174 m) long with a longest span of 103 ft (31.4 m) and a deck 59 ft wide.

Who owns Lp 363 Ebml over IH 35 Ml & FR?

It is owned by the State Highway Agency.