Berger/Hart RD over Channel a Outfall
GoodBell County, Texas · 0.02 Mi. W. of IH 35 · Structure no. 090140001504585
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected March 2023
- Type
- Culvert
- Concrete
- Length
- 22 ft
- 2 main spans
- Daily traffic
- 68,800
- 2014 count
- Owner
- State
- State Highway Agency
About this bridge
Berger/Hart RD over Channel a Outfall is a concrete culvert carrying Berger/Hart RD over Channel a Outfall in Bell County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 68,800 vehicles a day, roughly 15% of them trucks, projected to reach 96,200 by 2034. The structure is 22 ft (6.6 m) long. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Berger/Hart RD over Channel a Outfall built?
It was built in 2018, making it 7 years old in 2025.
What condition is Berger/Hart RD over Channel a Outfall in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does Berger/Hart RD over Channel a Outfall carry?
About 68,800 vehicles per day (2014 count), of which roughly 15% are trucks.
How long is Berger/Hart RD over Channel a Outfall?
The structure is 22 ft (6.6 m) long with a longest span of 7 ft (2.1 m).
Who owns Berger/Hart RD over Channel a Outfall?
It is owned by the State Highway Agency.