US Bridges

IH 35 Sbml over Big Elm Creek

Fair

Bell County, Texas · 1.45 MI North of FM 935 · Structure no. 090140001504556

Built
2018
7 years old
Condition
Fair
inspected January 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
210 ft
1 main span
Daily traffic
68,800
2014 count
Owner
State
State Highway Agency

About this bridge

IH 35 Sbml over Big Elm Creek is a prestressed concrete stringer/multi-beam or girder carrying IH 35 Sbml over Big Elm Creek in Bell County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 68,800 vehicles a day, roughly 20% of them trucks, projected to reach 1 by 1900. The structure is 210 ft (64 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIH 35 Sbml
CrossesBig Elm Creek
Location1.45 MI North of FM 935
RouteInterstate 35
StateTexas
Coordinates31.22586, -97.29255
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1 (+2 approach)
Design loadHL 93
Structure length210 ft (64 m)
Longest span110 ft (33.5 m)
Deck width60 ft (18.3 m)
Roadway width58 ft (17.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic68,800 (2014)
Projected traffic1 by 1900
Trucks20%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 35 Sbml over Big Elm Creek built?

It was built in 2018, making it 7 years old in 2025.

What condition is IH 35 Sbml over Big Elm Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.

How much traffic does IH 35 Sbml over Big Elm Creek carry?

About 68,800 vehicles per day (2014 count), of which roughly 20% are trucks.

How long is IH 35 Sbml over Big Elm Creek?

The structure is 210 ft (64 m) long with a longest span of 110 ft (33.5 m) and a deck 60 ft wide.

Who owns IH 35 Sbml over Big Elm Creek?

It is owned by the State Highway Agency.