US Bridges

Bus US 181 over Poesta Creek

Good

Bee County, Texas · 0.1 MI SE of US 59 · Structure no. 160130010107020

Built
2006
19 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
435 ft
6 main spans
Daily traffic
4,840
2022 count
Owner
State
State Highway Agency

About this bridge

Bus US 181 over Poesta Creek is a prestressed concrete stringer/multi-beam or girder carrying Bus US 181 over Poesta Creek in Bee County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,840 vehicles a day, roughly 16% of them trucks, projected to reach 6,776 by 2042. The structure is 435 ft (132.6 m) long and 60 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesBus US 181
CrossesPoesta Creek
Location0.1 MI SE of US 59
RouteState Highway 181
StateTexas
Coordinates28.39894, -97.74759
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans6
Design loadHL 93
Structure length435 ft (132.6 m)
Longest span85 ft (25.9 m)
Deck width60 ft (18.3 m)
Roadway width47 ft (14.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,840 (2022)
Projected traffic6,776 by 2042
Trucks16%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$51,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Bus US 181 over Poesta Creek built?

It was built in 2006, making it 19 years old in 2025.

What condition is Bus US 181 over Poesta Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Bus US 181 over Poesta Creek carry?

About 4,840 vehicles per day (2022 count), of which roughly 16% are trucks.

How long is Bus US 181 over Poesta Creek?

The structure is 435 ft (132.6 m) long with a longest span of 85 ft (25.9 m) and a deck 60 ft wide.

Who owns Bus US 181 over Poesta Creek?

It is owned by the State Highway Agency.