US Bridges

US 70 over Drainage Ditch

Good

Bailey County, Texas · 3.5 MI NW of FM 2079 · Structure no. 050090005202023

Built
1968
57 years old, rebuilt 2022
Condition
Good
inspected August 2023
Type
Culvert
Concrete
Length
23 ft
4 main spans
Daily traffic
2,704
2019 count
Owner
State
State Highway Agency

About this bridge

US 70 over Drainage Ditch is a concrete culvert carrying US 70 over Drainage Ditch in Bailey County, Texas. It was built in 1968 and reconstructed in 2022, so it is 57 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,704 vehicles a day, roughly 22% of them trucks, projected to reach 2,710 by 2033. The structure is 23 ft (7 m) long and 140 ft wide. If it were closed, the detour would be 21.1 mi (34 km).

CarriesUS 70
CrossesDrainage Ditch
Location3.5 MI NW of FM 2079
RouteU.S. Route 70
StateTexas
Coordinates34.28818, -102.82618
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length23 ft (7 m)
Longest span5 ft (1.5 m)
Deck width140 ft (42.8 m)
Roadway width84 ft (25.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,704 (2019)
Projected traffic2,710 by 2033
Trucks22%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed21.1 mi (34 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 70 over Drainage Ditch built?

It was built in 1968, making it 57 years old in 2025. It was reconstructed in 2022.

What condition is US 70 over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does US 70 over Drainage Ditch carry?

About 2,704 vehicles per day (2019 count), of which roughly 22% are trucks.

How long is US 70 over Drainage Ditch?

The structure is 23 ft (7 m) long with a longest span of 5 ft (1.5 m) and a deck 140 ft wide.

Who owns US 70 over Drainage Ditch?

It is owned by the State Highway Agency.