Peters-San Felipe over Bullinger Creek
FairClosed to trafficAustin County, Texas · 0.40 MI NW of Peach ST · Structure no. 130080E00150001
- Built
- 1996
- 29 years old
- Condition
- Fair
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 110 ft
- 3 main spans
- Daily traffic
- 230
- 2012 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Peters-San Felipe over Bullinger Creek is a prestressed concrete stringer/multi-beam or girder carrying Peters-San Felipe over Bullinger Creek in Austin County, Texas. It was built in 1996, so it is 29 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: closed to all traffic.
It carries about 230 vehicles a day, projected to reach 1,650 by 2042. The structure is 110 ft (33.5 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Peters-San Felipe over Bullinger Creek built?
It was built in 1996, making it 29 years old in 2025.
What condition is Peters-San Felipe over Bullinger Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Peters-San Felipe over Bullinger Creek carry?
About 230 vehicles per day (2012 count).
How long is Peters-San Felipe over Bullinger Creek?
The structure is 110 ft (33.5 m) long with a longest span of 40 ft (12.2 m) and a deck 26 ft wide.
Who owns Peters-San Felipe over Bullinger Creek?
It is owned by the City or Municipal Highway Agency.