US Bridges

Peters-San Felipe over Bullinger Creek

FairClosed to traffic

Austin County, Texas · 0.40 MI NW of Peach ST · Structure no. 130080E00150001

Built
1996
29 years old
Condition
Fair
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
110 ft
3 main spans
Daily traffic
230
2012 count
Owner
City
City or Municipal Highway Agency

About this bridge

Peters-San Felipe over Bullinger Creek is a prestressed concrete stringer/multi-beam or girder carrying Peters-San Felipe over Bullinger Creek in Austin County, Texas. It was built in 1996, so it is 29 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: closed to all traffic.

It carries about 230 vehicles a day, projected to reach 1,650 by 2042. The structure is 110 ft (33.5 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesPeters-San Felipe
CrossesBullinger Creek
Location0.40 MI NW of Peach ST
RouteCity Street 0
StateTexas
Coordinates29.81149, -96.11472
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusClosed to all traffic
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation0: Immediate repair necessary to put back in service
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating0 US tons
Inventory rating0 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length110 ft (33.5 m)
Longest span40 ft (12.2 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic230 (2012)
Projected traffic1,650 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Peters-San Felipe over Bullinger Creek built?

It was built in 1996, making it 29 years old in 2025.

What condition is Peters-San Felipe over Bullinger Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does Peters-San Felipe over Bullinger Creek carry?

About 230 vehicles per day (2012 count).

How long is Peters-San Felipe over Bullinger Creek?

The structure is 110 ft (33.5 m) long with a longest span of 40 ft (12.2 m) and a deck 26 ft wide.

Who owns Peters-San Felipe over Bullinger Creek?

It is owned by the City or Municipal Highway Agency.