Star Hill RD over Post Oak Point Creek
GoodAustin County, Texas · 2.8 MI NE of FM 109 · Structure no. 130080AA5196001
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 73 ft
- 1 main span
- Daily traffic
- 250
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Star Hill RD over Post Oak Point Creek is a steel stringer/multi-beam or girder carrying Star Hill RD over Post Oak Point Creek in Austin County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 250 vehicles a day, roughly 3% of them trucks, projected to reach 90 by 2042. The structure is 73 ft (22.3 m) long and 29 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Star Hill RD over Post Oak Point Creek built?
It was built in 2013, making it 12 years old in 2025.
What condition is Star Hill RD over Post Oak Point Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does Star Hill RD over Post Oak Point Creek carry?
About 250 vehicles per day (2022 count), of which roughly 3% are trucks.
How long is Star Hill RD over Post Oak Point Creek?
The structure is 73 ft (22.3 m) long with a longest span of 72 ft (21.9 m) and a deck 29 ft wide.
Who owns Star Hill RD over Post Oak Point Creek?
It is owned by the County Highway Agency.