IH 10 Wbfr over San Bernard River
GoodAustin County, Texas · 8.90 MI W of SH 36 · Structure no. 130080027102793
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected February 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 760 ft
- 8 main spans
- Daily traffic
- 45,021
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
IH 10 Wbfr over San Bernard River is a prestressed concrete box beam or girders - multiple carrying IH 10 Wbfr over San Bernard River in Austin County, Texas. It was built in 2022, so it is 3 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 45,021 vehicles a day, roughly 29% of them trucks, projected to reach 184 by 2040. The structure is 760 ft (231.6 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 10 Wbfr over San Bernard River built?
It was built in 2022, making it 3 years old in 2025.
What condition is IH 10 Wbfr over San Bernard River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does IH 10 Wbfr over San Bernard River carry?
About 45,021 vehicles per day (2021 count), of which roughly 29% are trucks.
How long is IH 10 Wbfr over San Bernard River?
The structure is 760 ft (231.6 m) long with a longest span of 100 ft (30.5 m) and a deck 40 ft wide.
Who owns IH 10 Wbfr over San Bernard River?
It is owned by the State Highway Agency.