US Bridges

CR 417 over Borrego Creek

Good

Atascosa County, Texas · .7 MI NW of FM 791 · Structure no. 150070AA0318001

Built
1987
38 years old
Condition
Good
inspected May 2023
Type
Slab
Concrete
Length
77 ft
3 main spans
Daily traffic
172
2015 count
Owner
County
County Highway Agency

About this bridge

CR 417 over Borrego Creek is a concrete slab carrying CR 417 over Borrego Creek in Atascosa County, Texas. It was built in 1987, so it is 38 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 172 vehicles a day, projected to reach 75 by 2031. The structure is 77 ft (23.5 m) long and 28 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesCR 417
CrossesBorrego Creek
Location.7 MI NW of FM 791
RouteCounty Highway 417
StateTexas
Coordinates28.78438, -98.29078
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.9 US tons
Inventory rating38 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length77 ft (23.5 m)
Longest span26 ft (7.9 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic172 (2015)
Projected traffic75 by 2031
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 417 over Borrego Creek built?

It was built in 1987, making it 38 years old in 2025.

What condition is CR 417 over Borrego Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does CR 417 over Borrego Creek carry?

About 172 vehicles per day (2015 count).

How long is CR 417 over Borrego Creek?

The structure is 77 ft (23.5 m) long with a longest span of 26 ft (7.9 m) and a deck 28 ft wide.

Who owns CR 417 over Borrego Creek?

It is owned by the County Highway Agency.