US Bridges

FM 294 over Salt Fork of Red River

Good

Armstrong County, Texas · 7.4 MI N of US 287 · Structure no. 040060078803005

Built
1951
74 years old
Condition
Good
inspected September 2024
Type
Slab
Concrete
Length
100 ft
4 main spans
Daily traffic
146
2020 count
Owner
State
State Highway Agency

About this bridge

FM 294 over Salt Fork of Red River is a concrete slab carrying FM 294 over Salt Fork of Red River in Armstrong County, Texas. It was built in 1951, so it is 74 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 146 vehicles a day, roughly 11% of them trucks, projected to reach 420 by 2033. The structure is 100 ft (30.5 m) long and 26 ft wide. If it were closed, the detour would be 36 mi (58 km).

CarriesFM 294
CrossesSalt Fork of Red River
Location7.4 MI N of US 287
RouteState Highway 294
StateTexas
Coordinates35.14283, -101.18834
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating59 US tons
Inventory rating30 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadH 15
Structure length100 ft (30.5 m)
Longest span25 ft (7.6 m)
Deck width26 ft (7.8 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic146 (2020)
Projected traffic420 by 2033
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed36 mi (58 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 294 over Salt Fork of Red River built?

It was built in 1951, making it 74 years old in 2025.

What condition is FM 294 over Salt Fork of Red River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does FM 294 over Salt Fork of Red River carry?

About 146 vehicles per day (2020 count), of which roughly 11% are trucks.

How long is FM 294 over Salt Fork of Red River?

The structure is 100 ft (30.5 m) long with a longest span of 25 ft (7.6 m) and a deck 26 ft wide.

Who owns FM 294 over Salt Fork of Red River?

It is owned by the State Highway Agency.