US 69 On-Ramp over Sandy Creek
GoodAngelina County, Texas · 0.30 MI S of SH 63 · Structure no. 110030024401074
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 110 ft
- 1 main span
- Daily traffic
- 3,100
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
US 69 On-Ramp over Sandy Creek is a prestressed concrete stringer/multi-beam or girder carrying US 69 On-Ramp over Sandy Creek in Angelina County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,100 vehicles a day, roughly 19% of them trucks, projected to reach 4,300 by 2032. The structure is 110 ft (33.5 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 69 On-Ramp over Sandy Creek built?
It was built in 2021, making it 4 years old in 2025.
What condition is US 69 On-Ramp over Sandy Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does US 69 On-Ramp over Sandy Creek carry?
About 3,100 vehicles per day (2022 count), of which roughly 19% are trucks.
How long is US 69 On-Ramp over Sandy Creek?
The structure is 110 ft (33.5 m) long with a longest span of 110 ft (33.5 m) and a deck 40 ft wide.
Who owns US 69 On-Ramp over Sandy Creek?
It is owned by the State Highway Agency.