Salt Works RD over Basset Creek
GoodAnderson County, Texas · 1.45 MI W of US 79 · Structure no. 100010B01450001
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected September 2023
- Type
- Slab
- Prestressed Concrete
- Length
- 40 ft
- 1 main span
- Daily traffic
- 410
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Salt Works RD over Basset Creek is a prestressed concrete slab carrying Salt Works RD over Basset Creek in Anderson County, Texas. It was built in 2020, so it is 5 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 410 vehicles a day, roughly 15% of them trucks, projected to reach 500 by 2038. The structure is 40 ft (12.2 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Salt Works RD over Basset Creek built?
It was built in 2020, making it 5 years old in 2025.
What condition is Salt Works RD over Basset Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Salt Works RD over Basset Creek carry?
About 410 vehicles per day (2018 count), of which roughly 15% are trucks.
How long is Salt Works RD over Basset Creek?
The structure is 40 ft (12.2 m) long with a longest span of 40 ft (12.2 m) and a deck 26 ft wide.
Who owns Salt Works RD over Basset Creek?
It is owned by the City or Municipal Highway Agency.