FAP 401 (sr 24) over Spring Creek
FairPosted for loadWilson County, Tennessee · 3.3 M NE JCT SR24&SR10 · Structure no. 95SR0240017
- Built
- 1931
- 94 years old, rebuilt 1960
- Condition
- Fair
- inspected November 2023
- Type
- Tee Beam
- Concrete
- Length
- 301 ft
- 7 main spans
- Daily traffic
- 6,450
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 401 (sr 24) over Spring Creek is a concrete tee beam carrying FAP 401 (sr 24) over Spring Creek in Wilson County, Tennessee. It was built in 1931 and reconstructed in 1960, so it is 94 years old, older than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 6,450 vehicles a day, roughly 2% of them trucks, projected to reach 10,320 by 2042. The structure is 301 ft (91.7 m) long and 28 ft wide. If it were closed, the detour would be 32.9 mi (53 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 401 (sr 24) over Spring Creek built?
It was built in 1931, making it 94 years old in 2025. It was reconstructed in 1960.
What condition is FAP 401 (sr 24) over Spring Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does FAP 401 (sr 24) over Spring Creek carry?
About 6,450 vehicles per day (2021 count), of which roughly 2% are trucks.
How long is FAP 401 (sr 24) over Spring Creek?
The structure is 301 ft (91.7 m) long with a longest span of 43 ft (13.1 m) and a deck 28 ft wide.
Who owns FAP 401 (sr 24) over Spring Creek?
It is owned by the State Highway Agency.