FAP 109 over SR 109 / I40
GoodWilson County, Tennessee · 3.6 M SE JCT SR109&SR24 · Structure no. 95I00400016
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 257 ft
- 2 main spans
- Daily traffic
- 34,489
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 109 over SR 109 / I40 is a prestressed concrete continuous stringer/multi-beam or girder carrying FAP 109 over SR 109 / I40 in Wilson County, Tennessee. It was built in 1998, so it is 27 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 34,489 vehicles a day, roughly 7% of them trucks, projected to reach 55,182 by 2042. The structure is 257 ft (78.4 m) long and 44 ft wide. If it were closed, the detour would be 19.3 mi (31 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 109 over SR 109 / I40 built?
It was built in 1998, making it 27 years old in 2025.
What condition is FAP 109 over SR 109 / I40 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does FAP 109 over SR 109 / I40 carry?
About 34,489 vehicles per day (2021 count), of which roughly 7% are trucks.
How long is FAP 109 over SR 109 / I40?
The structure is 257 ft (78.4 m) long with a longest span of 135 ft (41 m) and a deck 44 ft wide.
Who owns FAP 109 over SR 109 / I40?
It is owned by the State Highway Agency.