US Bridges

FAU D062 over Branch

Good

Williamson County, Tennessee · 3 MI SE JCT I65&SR96 · Structure no. 940D0620003

Built
2016
9 years old
Condition
Good
inspected May 2023
Type
Culvert
Concrete Continuous
Length
38 ft
2 main spans
Daily traffic
520
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

FAU D062 over Branch is a concrete continuous culvert carrying FAU D062 over Branch in Williamson County, Tennessee. It was built in 2016, so it is 9 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 520 vehicles a day, roughly 1% of them trucks, projected to reach 832 by 2041. The structure is 38 ft (11.6 m) long. If it were closed, the detour would be 123.7 mi (199 km).

CarriesFAU D062
CrossesBranch
Location3 MI SE JCT I65&SR96
RouteCounty Highway 62
Coordinates35.88668, -86.819
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length38 ft (11.6 m)
Longest span19 ft (5.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic520 (2020)
Projected traffic832 by 2041
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAU D062 over Branch built?

It was built in 2016, making it 9 years old in 2025.

What condition is FAU D062 over Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does FAU D062 over Branch carry?

About 520 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is FAU D062 over Branch?

The structure is 38 ft (11.6 m) long with a longest span of 19 ft (5.8 m).

Who owns FAU D062 over Branch?

It is owned by the City or Municipal Highway Agency.