FAU 4746 over Spencer Creek
GoodWilliamson County, Tennessee · 1.7 MI NE JCT SR6&SR397 · Structure no. 940B1500001
- Built
- 1990
- 35 years old
- Condition
- Good
- inspected June 2023
- Type
- Culvert
- Concrete Continuous
- Length
- 37 ft
- 2 main spans
- Daily traffic
- 25,941
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
FAU 4746 over Spencer Creek is a concrete continuous culvert carrying FAU 4746 over Spencer Creek in Williamson County, Tennessee. It was built in 1990, so it is 35 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 25,941 vehicles a day, roughly 7% of them trucks, projected to reach 41,506 by 2042. The structure is 37 ft (11.3 m) long. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 4746 over Spencer Creek built?
It was built in 1990, making it 35 years old in 2025.
What condition is FAU 4746 over Spencer Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does FAU 4746 over Spencer Creek carry?
About 25,941 vehicles per day (2021 count), of which roughly 7% are trucks.
How long is FAU 4746 over Spencer Creek?
The structure is 37 ft (11.3 m) long with a longest span of 12 ft (3.7 m).
Who owns FAU 4746 over Spencer Creek?
It is owned by the City or Municipal Highway Agency.