US Bridges

FAU 2041 over SR 386

Good

Sumner County, Tennessee · Big Station Camp Blvd · Structure no. 83SR3860035

Built
2006
19 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
238 ft
2 main spans
Daily traffic
9,277
2021 count
Owner
State
State Highway Agency

About this bridge

FAU 2041 over SR 386 is a prestressed concrete continuous stringer/multi-beam or girder carrying FAU 2041 over SR 386 in Sumner County, Tennessee. It was built in 2006, so it is 19 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,277 vehicles a day, roughly 3% of them trucks, projected to reach 11,584 by 2040. The structure is 238 ft (72.5 m) long and 54 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesFAU 2041
CrossesSR 386
LocationBig Station Camp Blvd
RouteCity Street 2041
Coordinates36.35823, -86.53341
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating95.7 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, precast panels
Main spans2
Design loadHS 20
Structure length238 ft (72.5 m)
Longest span117 ft (35.6 m)
Deck width54 ft (16.5 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,277 (2021)
Projected traffic11,584 by 2040
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FAU 2041 over SR 386 built?

It was built in 2006, making it 19 years old in 2025.

What condition is FAU 2041 over SR 386 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does FAU 2041 over SR 386 carry?

About 9,277 vehicles per day (2021 count), of which roughly 3% are trucks.

How long is FAU 2041 over SR 386?

The structure is 238 ft (72.5 m) long with a longest span of 117 ft (35.6 m) and a deck 54 ft wide.

Who owns FAU 2041 over SR 386?

It is owned by the State Highway Agency.