FAU 5287 over Summers Branch
FairSumner County, Tennessee · 2.4 M E JCT SR41&SR52 · Structure no. 83SR0520001
- Built
- 1934
- 91 years old
- Condition
- Fair
- inspected January 2025
- Type
- Tee Beam
- Concrete
- Length
- 57 ft
- 2 main spans
- Daily traffic
- 3,624
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
FAU 5287 over Summers Branch is a concrete tee beam carrying FAU 5287 over Summers Branch in Sumner County, Tennessee. It was built in 1934, so it is 91 years old, older than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,624 vehicles a day, roughly 4% of them trucks, projected to reach 4,784 by 2041. The structure is 57 ft (17.4 m) long and 28 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 5287 over Summers Branch built?
It was built in 1934, making it 91 years old in 2025.
What condition is FAU 5287 over Summers Branch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does FAU 5287 over Summers Branch carry?
About 3,624 vehicles per day (2021 count), of which roughly 4% are trucks.
How long is FAU 5287 over Summers Branch?
The structure is 57 ft (17.4 m) long with a longest span of 27 ft (8.2 m) and a deck 28 ft wide.
Who owns FAU 5287 over Summers Branch?
It is owned by the City or Municipal Highway Agency.