US Bridges

FAP 93 over Shipley Road (C276)

Good

Sullivan County, Tennessee · 1.7 M S JCT SR1&SR93 · Structure no. 82SR0930020

Built
1965
60 years old
Condition
Good
inspected January 2025
Type
Tee Beam
Concrete Continuous
Length
109 ft
3 main spans
Daily traffic
21,772
2021 count
Owner
State
State Highway Agency

About this bridge

FAP 93 over Shipley Road (C276) is a concrete continuous tee beam carrying FAP 93 over Shipley Road (C276) in Sullivan County, Tennessee. It was built in 1965, so it is 60 years old, older than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 21,772 vehicles a day, roughly 6% of them trucks, projected to reach 32,226 by 2041. The structure is 109 ft (33.2 m) long and 34 ft wide. If it were closed, the detour would be 29.8 mi (48 km).

CarriesFAP 93
CrossesShipley Road (C276)
Location1.7 M S JCT SR1&SR93
RouteState Highway 93
Coordinates36.52362, -82.51073
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.2 US tons
Inventory rating35.4 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length109 ft (33.2 m)
Longest span44 ft (13.5 m)
Deck width34 ft (10.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic21,772 (2021)
Projected traffic32,226 by 2041
Trucks6%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed29.8 mi (48 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.8 million (2021 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was FAP 93 over Shipley Road (C276) built?

It was built in 1965, making it 60 years old in 2025.

What condition is FAP 93 over Shipley Road (C276) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does FAP 93 over Shipley Road (C276) carry?

About 21,772 vehicles per day (2021 count), of which roughly 6% are trucks.

How long is FAP 93 over Shipley Road (C276)?

The structure is 109 ft (33.2 m) long with a longest span of 44 ft (13.5 m) and a deck 34 ft wide.

Who owns FAP 93 over Shipley Road (C276)?

It is owned by the State Highway Agency.