US Bridges

FAP 93 over Horse Creek

Good

Sullivan County, Tennessee · .35 Mi.N.Of Washington CO · Structure no. 82SR0930001

Built
1990
35 years old
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
108 ft
3 main spans
Daily traffic
3,065
2021 count
Owner
State
State Highway Agency

About this bridge

FAP 93 over Horse Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying FAP 93 over Horse Creek in Sullivan County, Tennessee. It was built in 1990, so it is 35 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,065 vehicles a day, roughly 10% of them trucks, projected to reach 5,216 by 2041. The structure is 108 ft (32.9 m) long and 46 ft wide. If it were closed, the detour would be 39.8 mi (64 km).

CarriesFAP 93
CrossesHorse Creek
Location.35 Mi.N.Of Washington CO
RouteState Highway 93
Coordinates36.43747, -82.625
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51.8 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length108 ft (32.9 m)
Longest span33 ft (10 m)
Deck width46 ft (14 m)
Roadway width43 ft (13 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,065 (2021)
Projected traffic5,216 by 2041
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed39.8 mi (64 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAP 93 over Horse Creek built?

It was built in 1990, making it 35 years old in 2025.

What condition is FAP 93 over Horse Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does FAP 93 over Horse Creek carry?

About 3,065 vehicles per day (2021 count), of which roughly 10% are trucks.

How long is FAP 93 over Horse Creek?

The structure is 108 ft (32.9 m) long with a longest span of 33 ft (10 m) and a deck 46 ft wide.

Who owns FAP 93 over Horse Creek?

It is owned by the State Highway Agency.