FAS 358 over S.Fk.Holston R. City ST
FairPosted for loadSullivan County, Tennessee · E of Bluff City · Structure no. 82S23730005
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 434 ft
- 4 main spans
- Daily traffic
- 1,205
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAS 358 over S.Fk.Holston R. City ST is a steel continuous stringer/multi-beam or girder carrying FAS 358 over S.Fk.Holston R. City ST in Sullivan County, Tennessee. It was built in 1975, so it is 50 years old, older than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 1,205 vehicles a day, roughly 5% of them trucks, projected to reach 1,928 by 2042. The structure is 434 ft (132.3 m) long and 32 ft wide. If it were closed, the detour would be 19.9 mi (32 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 358 over S.Fk.Holston R. City ST built?
It was built in 1975, making it 50 years old in 2025.
What condition is FAS 358 over S.Fk.Holston R. City ST in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does FAS 358 over S.Fk.Holston R. City ST carry?
About 1,205 vehicles per day (2021 count), of which roughly 5% are trucks.
How long is FAS 358 over S.Fk.Holston R. City ST?
The structure is 434 ft (132.3 m) long with a longest span of 120 ft (36.6 m) and a deck 32 ft wide.
Who owns FAS 358 over S.Fk.Holston R. City ST?
It is owned by the State Highway Agency.