FAP 401 (sr 24) over Plunketts Creek
FairSmith County, Tennessee · 3.9 Mi.W.Of S.Carthage · Structure no. 80SR0240005
- Built
- 1940
- 85 years old
- Condition
- Fair
- inspected May 2023
- Type
- Tee Beam
- Concrete
- Length
- 171 ft
- 6 main spans
- Daily traffic
- 4,375
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 401 (sr 24) over Plunketts Creek is a concrete tee beam carrying FAP 401 (sr 24) over Plunketts Creek in Smith County, Tennessee. It was built in 1940, so it is 85 years old, older than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,375 vehicles a day, roughly 6% of them trucks, projected to reach 7,000 by 2042. The structure is 171 ft (52.1 m) long and 36 ft wide. If it were closed, the detour would be 32.9 mi (53 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 401 (sr 24) over Plunketts Creek built?
It was built in 1940, making it 85 years old in 2025.
What condition is FAP 401 (sr 24) over Plunketts Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does FAP 401 (sr 24) over Plunketts Creek carry?
About 4,375 vehicles per day (2021 count), of which roughly 6% are trucks.
How long is FAP 401 (sr 24) over Plunketts Creek?
The structure is 171 ft (52.1 m) long with a longest span of 28 ft (8.5 m) and a deck 36 ft wide.
Who owns FAP 401 (sr 24) over Plunketts Creek?
It is owned by the State Highway Agency.