FAP 35 over Gists Creek Rl
FairSevier County, Tennessee · In Sevierville · Structure no. 78SR0350015
- Built
- 1956
- 69 years old
- Condition
- Fair
- inspected September 2023
- Type
- Tee Beam
- Concrete
- Length
- 86 ft
- 4 main spans
- Daily traffic
- 15,031
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 35 over Gists Creek Rl is a concrete tee beam carrying FAP 35 over Gists Creek Rl in Sevier County, Tennessee. It was built in 1956, so it is 69 years old, older than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,031 vehicles a day, roughly 9% of them trucks, projected to reach 21,883 by 2041. The structure is 86 ft (26.1 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 35 over Gists Creek Rl built?
It was built in 1956, making it 69 years old in 2025.
What condition is FAP 35 over Gists Creek Rl in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does FAP 35 over Gists Creek Rl carry?
About 15,031 vehicles per day (2021 count), of which roughly 9% are trucks.
How long is FAP 35 over Gists Creek Rl?
The structure is 86 ft (26.1 m) long with a longest span of 29 ft (8.7 m) and a deck 34 ft wide.
Who owns FAP 35 over Gists Creek Rl?
It is owned by the State Highway Agency.