US Bridges

FAU C396 over Middle Creek

Good

Sevier County, Tennessee · Blanton Drive · Structure no. 780C3960001

Built
2004
21 years old
Condition
Good
inspected May 2023
Type
Culvert
Concrete Continuous
Length
82 ft
5 main spans
Daily traffic
950
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

FAU C396 over Middle Creek is a concrete continuous culvert carrying FAU C396 over Middle Creek in Sevier County, Tennessee. It was built in 2004, so it is 21 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 950 vehicles a day, roughly 9% of them trucks, projected to reach 1,520 by 2041. The structure is 82 ft (25 m) long. If it were closed, the detour would be 5 mi (8 km).

CarriesFAU C396
CrossesMiddle Creek
LocationBlanton Drive
RouteCity Street 0C396
Coordinates35.85329, -83.53971
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating98.2 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length82 ft (25 m)
Longest span15 ft (4.6 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic950 (2020)
Projected traffic1,520 by 2041
Trucks9%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAU C396 over Middle Creek built?

It was built in 2004, making it 21 years old in 2025.

What condition is FAU C396 over Middle Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does FAU C396 over Middle Creek carry?

About 950 vehicles per day (2020 count), of which roughly 9% are trucks.

How long is FAU C396 over Middle Creek?

The structure is 82 ft (25 m) long with a longest span of 15 ft (4.6 m).

Who owns FAU C396 over Middle Creek?

It is owned by the City or Municipal Highway Agency.