FAU 266 over Stewart Creek
GoodRutherford County, Tennessee · 2.7 M NW JCT SR1&SR102 · Structure no. 75SR2660001
- Built
- 1986
- 39 years old
- Condition
- Good
- inspected January 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 137 ft
- 3 main spans
- Daily traffic
- 25,910
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAU 266 over Stewart Creek is a prestressed concrete continuous box beam or girders - single or spread carrying FAU 266 over Stewart Creek in Rutherford County, Tennessee. It was built in 1986, so it is 39 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 25,910 vehicles a day, roughly 4% of them trucks, projected to reach 38,032 by 2041. The structure is 137 ft (41.8 m) long and 68 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 266 over Stewart Creek built?
It was built in 1986, making it 39 years old in 2025.
What condition is FAU 266 over Stewart Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.
How much traffic does FAU 266 over Stewart Creek carry?
About 25,910 vehicles per day (2021 count), of which roughly 4% are trucks.
How long is FAU 266 over Stewart Creek?
The structure is 137 ft (41.8 m) long with a longest span of 46 ft (14 m) and a deck 68 ft wide.
Who owns FAU 266 over Stewart Creek?
It is owned by the State Highway Agency.