FAP 72 over Paint Rock Creek
FairRoane County, Tennessee · 1.87 Mi.W.Of Loudon Co. · Structure no. 73SR0720001
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 171 ft
- 3 main spans
- Daily traffic
- 1,574
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 72 over Paint Rock Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying FAP 72 over Paint Rock Creek in Roane County, Tennessee. It was built in 1995, so it is 30 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,574 vehicles a day, roughly 5% of them trucks, projected to reach 2,598 by 2041. The structure is 171 ft (52.1 m) long and 38 ft wide. If it were closed, the detour would be 77.1 mi (124 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 72 over Paint Rock Creek built?
It was built in 1995, making it 30 years old in 2025.
What condition is FAP 72 over Paint Rock Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does FAP 72 over Paint Rock Creek carry?
About 1,574 vehicles per day (2021 count), of which roughly 5% are trucks.
How long is FAP 72 over Paint Rock Creek?
The structure is 171 ft (52.1 m) long with a longest span of 57 ft (17.4 m) and a deck 38 ft wide.
Who owns FAP 72 over Paint Rock Creek?
It is owned by the State Highway Agency.