FAU 1 841881K over Sou Rwy & Black Creek
GoodRoane County, Tennessee · 2.46 Mi.S.Of Cumberland · Structure no. 73SR0010001
- Built
- 1952
- 73 years old, rebuilt 2010
- Condition
- Good
- inspected May 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 257 ft
- 9 main spans
- Daily traffic
- 2,953
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAU 1 841881K over Sou Rwy & Black Creek is a prestressed concrete continuous box beam or girders - single or spread carrying FAU 1 841881K over Sou Rwy & Black Creek in Roane County, Tennessee. It was built in 1952 and reconstructed in 2010, so it is 73 years old, older than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,953 vehicles a day, roughly 3% of them trucks, projected to reach 4,315 by 2041. The structure is 257 ft (78.2 m) long and 34 ft wide. If it were closed, the detour would be 80.2 mi (129 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 1 841881K over Sou Rwy & Black Creek built?
It was built in 1952, making it 73 years old in 2025. It was reconstructed in 2010.
What condition is FAU 1 841881K over Sou Rwy & Black Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does FAU 1 841881K over Sou Rwy & Black Creek carry?
About 2,953 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is FAU 1 841881K over Sou Rwy & Black Creek?
The structure is 257 ft (78.2 m) long with a longest span of 29 ft (8.7 m) and a deck 34 ft wide.
Who owns FAU 1 841881K over Sou Rwy & Black Creek?
It is owned by the State Highway Agency.