FAP 401 (sr 24) over Spring Creek
FairPutnam County, Tennessee · 3.1 Mi.W.Of Cookeville · Structure no. 71SR0240001
- Built
- 1928
- 97 years old, rebuilt 1960
- Condition
- Fair
- inspected June 2024
- Type
- Tee Beam
- Concrete
- Length
- 37 ft
- 1 main span
- Daily traffic
- 6,586
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 401 (sr 24) over Spring Creek is a concrete tee beam carrying FAP 401 (sr 24) over Spring Creek in Putnam County, Tennessee. It was built in 1928 and reconstructed in 1960, so it is 97 years old, older than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,586 vehicles a day, roughly 9% of them trucks, projected to reach 10,538 by 2042. The structure is 37 ft (11.2 m) long and 34 ft wide. If it were closed, the detour would be 29.8 mi (48 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 401 (sr 24) over Spring Creek built?
It was built in 1928, making it 97 years old in 2025. It was reconstructed in 1960.
What condition is FAP 401 (sr 24) over Spring Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does FAP 401 (sr 24) over Spring Creek carry?
About 6,586 vehicles per day (2021 count), of which roughly 9% are trucks.
How long is FAP 401 (sr 24) over Spring Creek?
The structure is 37 ft (11.2 m) long with a longest span of 34 ft (10.4 m) and a deck 34 ft wide.
Who owns FAP 401 (sr 24) over Spring Creek?
It is owned by the State Highway Agency.