US Bridges

FAS 128 over Cedar Creek

Good

Perry County, Tennessee · 8.0 M NE Wayne CO Li · Structure no. 68S61740003

Built
2017
8 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
190 ft
2 main spans
Daily traffic
666
2021 count
Owner
State
State Highway Agency

About this bridge

FAS 128 over Cedar Creek is a prestressed concrete stringer/multi-beam or girder carrying FAS 128 over Cedar Creek in Perry County, Tennessee. It was built in 2017, so it is 8 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 666 vehicles a day, roughly 6% of them trucks, projected to reach 1,021 by 2041. The structure is 190 ft (57.9 m) long and 31 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesFAS 128
CrossesCedar Creek
Location8.0 M NE Wayne CO Li
RouteState Highway 128
Coordinates35.52336, -87.92632
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length190 ft (57.9 m)
Longest span95 ft (29 m)
Deck width31 ft (9.5 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic666 (2021)
Projected traffic1,021 by 2041
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAS 128 over Cedar Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is FAS 128 over Cedar Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does FAS 128 over Cedar Creek carry?

About 666 vehicles per day (2021 count), of which roughly 6% are trucks.

How long is FAS 128 over Cedar Creek?

The structure is 190 ft (57.9 m) long with a longest span of 95 ft (29 m) and a deck 31 ft wide.

Who owns FAS 128 over Cedar Creek?

It is owned by the State Highway Agency.