US Bridges

I69 over Hoosier Creek

Good

Obion County, Tennessee · 0.5 KM S of I69/SR003 · Structure no. 66I00690049

Built
2020
5 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
140 ft
1 main span
Daily traffic
—
2020 count
Owner
State
State Highway Agency

About this bridge

I69 over Hoosier Creek is a prestressed concrete stringer/multi-beam or girder carrying I69 over Hoosier Creek in Obion County, Tennessee. It was built in 2020, so it is 5 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: new structure not yet open to traffic.

No traffic count is recorded. The structure is 140 ft (42.7 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI69
CrossesHoosier Creek
Location0.5 KM S of I69/SR003
RouteInterstate 69
Coordinates36.39348, -89.09428
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusNew structure not yet open to traffic
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length140 ft (42.7 m)
Longest span140 ft (42.7 m)
Deck width43 ft (13.2 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic—
Projected traffic—
Trucks—
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I69 over Hoosier Creek built?

It was built in 2020, making it 5 years old in 2025.

What condition is I69 over Hoosier Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does I69 over Hoosier Creek carry?

No traffic count is recorded for this structure.

How long is I69 over Hoosier Creek?

The structure is 140 ft (42.7 m) long with a longest span of 140 ft (42.7 m) and a deck 43 ft wide.

Who owns I69 over Hoosier Creek?

It is owned by the State Highway Agency.