US Bridges

Palmyra Road over Piney Fork Creek

Fair

Montgomery County, Tennessee · 0.5 MI SW Mabry/Palmyra · Structure no. DAPFORCAT000027

Built
1953
72 years old
Condition
Fair
inspected November 2024
Type
Tee Beam
Concrete
Length
91 ft
3 main spans
Daily traffic
500
2024 count
Owner
Federal
Army

About this bridge

Palmyra Road over Piney Fork Creek is a concrete tee beam carrying Palmyra Road over Piney Fork Creek in Montgomery County, Tennessee. It was built in 1953, so it is 72 years old, older than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 500 vehicles a day, roughly 40% of them trucks, projected to reach 500 by 2046. The structure is 91 ft (27.8 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesPalmyra Road
CrossesPiney Fork Creek
Location0.5 MI SW Mabry/Palmyra
Coordinates36.61918, -87.58142
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating46.7 US tons
Inventory rating36 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length91 ft (27.8 m)
Longest span28 ft (8.5 m)
Deck width26 ft (8 m)
Roadway width24 ft (7.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2024)
Projected traffic500 by 2046
Trucks40%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerArmy
Maintained byArmy
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$37,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Palmyra Road over Piney Fork Creek built?

It was built in 1953, making it 72 years old in 2025.

What condition is Palmyra Road over Piney Fork Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does Palmyra Road over Piney Fork Creek carry?

About 500 vehicles per day (2024 count), of which roughly 40% are trucks.

How long is Palmyra Road over Piney Fork Creek?

The structure is 91 ft (27.8 m) long with a longest span of 28 ft (8.5 m) and a deck 26 ft wide.

Who owns Palmyra Road over Piney Fork Creek?

It is owned by the Army.