US Bridges

FAP 7 350584K over Tennessee Southern RR

Good

Maury County, Tennessee · 1.69 Mi.N. Jct. FAS 6368 · Structure no. 60SR0070013

Built
2005
20 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Concrete Continuous
Length
166 ft
3 main spans
Daily traffic
3,833
2021 count
Owner
State
State Highway Agency

About this bridge

FAP 7 350584K over Tennessee Southern RR is a concrete continuous stringer/multi-beam or girder carrying FAP 7 350584K over Tennessee Southern RR in Maury County, Tennessee. It was built in 2005, so it is 20 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,833 vehicles a day, roughly 9% of them trucks, projected to reach 6,133 by 2042. The structure is 166 ft (50.6 m) long and 78 ft wide. If it were closed, the detour would be 16.8 mi (27 km).

CarriesFAP 7 350584K
CrossesTennessee Southern RR
Location1.69 Mi.N. Jct. FAS 6368
RouteState Highway 7
Coordinates35.64845, -87.04874
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.5 US tons
Inventory rating35.7 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length166 ft (50.6 m)
Longest span70 ft (21.3 m)
Deck width78 ft (23.8 m)
Roadway width76 ft (23.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,833 (2021)
Projected traffic6,133 by 2042
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed16.8 mi (27 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FAP 7 350584K over Tennessee Southern RR built?

It was built in 2005, making it 20 years old in 2025.

What condition is FAP 7 350584K over Tennessee Southern RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does FAP 7 350584K over Tennessee Southern RR carry?

About 3,833 vehicles per day (2021 count), of which roughly 9% are trucks.

How long is FAP 7 350584K over Tennessee Southern RR?

The structure is 166 ft (50.6 m) long with a longest span of 70 ft (21.3 m) and a deck 78 ft wide.

Who owns FAP 7 350584K over Tennessee Southern RR?

It is owned by the State Highway Agency.