FAU 926 (sa 5721) over Meridian Creek
GoodMadison County, Tennessee · .73 Mi. East of SR 5 · Structure no. 57S80580001
- Built
- 1987
- 38 years old
- Condition
- Good
- inspected May 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 125 ft
- 3 main spans
- Daily traffic
- 2,762
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
FAU 926 (sa 5721) over Meridian Creek is a prestressed concrete box beam or girders - single or spread carrying FAU 926 (sa 5721) over Meridian Creek in Madison County, Tennessee. It was built in 1987, so it is 38 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,762 vehicles a day, roughly 3% of them trucks, projected to reach 4,448 by 2041. The structure is 125 ft (38.1 m) long and 32 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 926 (sa 5721) over Meridian Creek built?
It was built in 1987, making it 38 years old in 2025.
What condition is FAU 926 (sa 5721) over Meridian Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does FAU 926 (sa 5721) over Meridian Creek carry?
About 2,762 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is FAU 926 (sa 5721) over Meridian Creek?
The structure is 125 ft (38.1 m) long with a longest span of 42 ft (12.8 m) and a deck 32 ft wide.
Who owns FAU 926 (sa 5721) over Meridian Creek?
It is owned by the City or Municipal Highway Agency.