FAP 73 over Tellico Lake & SR-444
FairLoudon County, Tennessee · 5 Mi.W.Of Blount Co. · Structure no. 53SR0950010
- Built
- 2017
- 8 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete Continuous
- Length
- 1,071 ft
- 5 main spans
- Daily traffic
- 13,140
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 73 over Tellico Lake & SR-444 is a concrete continuous stringer/multi-beam or girder carrying FAP 73 over Tellico Lake & SR-444 in Loudon County, Tennessee. It was built in 2017, so it is 8 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 13,140 vehicles a day, roughly 10% of them trucks, projected to reach 21,024 by 2042. The structure is 1,071 ft (326.4 m) long and 44 ft wide. If it were closed, the detour would be 65.2 mi (105 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 73 over Tellico Lake & SR-444 built?
It was built in 2017, making it 8 years old in 2025.
What condition is FAP 73 over Tellico Lake & SR-444 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does FAP 73 over Tellico Lake & SR-444 carry?
About 13,140 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is FAP 73 over Tellico Lake & SR-444?
The structure is 1,071 ft (326.4 m) long with a longest span of 256 ft (78 m) and a deck 44 ft wide.
Who owns FAP 73 over Tellico Lake & SR-444?
It is owned by the State Highway Agency.