FAP 48 over Trace Creek
FairLewis County, Tennessee · 4.7 Mi.Sw.Of Hohenwald · Structure no. 51SR0480005
- Built
- 1929
- 96 years old, rebuilt 1973
- Condition
- Fair
- inspected May 2023
- Type
- Tee Beam
- Concrete
- Length
- 152 ft
- 4 main spans
- Daily traffic
- 1,071
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 48 over Trace Creek is a concrete tee beam carrying FAP 48 over Trace Creek in Lewis County, Tennessee. It was built in 1929 and reconstructed in 1973, so it is 96 years old, older than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,071 vehicles a day, roughly 6% of them trucks, projected to reach 1,690 by 2041. The structure is 152 ft (46.3 m) long and 40 ft wide. If it were closed, the detour would be 34.8 mi (56 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 48 over Trace Creek built?
It was built in 1929, making it 96 years old in 2025. It was reconstructed in 1973.
What condition is FAP 48 over Trace Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does FAP 48 over Trace Creek carry?
About 1,071 vehicles per day (2021 count), of which roughly 6% are trucks.
How long is FAP 48 over Trace Creek?
The structure is 152 ft (46.3 m) long with a longest span of 43 ft (13.1 m) and a deck 40 ft wide.
Who owns FAP 48 over Trace Creek?
It is owned by the State Highway Agency.