US Bridges

FAU 1 over First Creek

Good

Knox County, Tennessee · In the City of Knoxville · Structure no. 47SR0010063

Built
1997
28 years old
Condition
Good
inspected September 2023
Type
Culvert
Concrete Continuous
Length
60 ft
3 main spans
Daily traffic
10,860
2021 count
Owner
State
State Highway Agency

About this bridge

FAU 1 over First Creek is a concrete continuous culvert carrying FAU 1 over First Creek in Knox County, Tennessee. It was built in 1997, so it is 28 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,860 vehicles a day, roughly 9% of them trucks, projected to reach 13,499 by 2041. The structure is 60 ft (18.4 m) long. If it were closed, the detour would be 5 mi (8 km).

CarriesFAU 1
CrossesFirst Creek
LocationIn the City of Knoxville
RouteU.S. Route 11
Coordinates35.97664, -83.91303
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.5 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans3
Design loadHS 20
Structure length60 ft (18.4 m)
Longest span18 ft (5.5 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,860 (2021)
Projected traffic13,499 by 2041
Trucks9%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$911,000 (2021 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was FAU 1 over First Creek built?

It was built in 1997, making it 28 years old in 2025.

What condition is FAU 1 over First Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does FAU 1 over First Creek carry?

About 10,860 vehicles per day (2021 count), of which roughly 9% are trucks.

How long is FAU 1 over First Creek?

The structure is 60 ft (18.4 m) long with a longest span of 18 ft (5.5 m).

Who owns FAU 1 over First Creek?

It is owned by the State Highway Agency.