FAU 168 over SR-168 / SR-1
FairKnox County, Tennessee · In Knoxville City Limits · Structure no. 47SR0010035
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 115 ft
- 3 main spans
- Daily traffic
- 10,098
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAU 168 over SR-168 / SR-1 is a steel stringer/multi-beam or girder carrying FAU 168 over SR-168 / SR-1 in Knox County, Tennessee. It was built in 1962, so it is 63 years old, older than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,098 vehicles a day, roughly 6% of them trucks, projected to reach 16,157 by 2042. The structure is 115 ft (35.1 m) long and 35 ft wide. If it were closed, the detour would be 14.9 mi (24 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 168 over SR-168 / SR-1 built?
It was built in 1962, making it 63 years old in 2025.
What condition is FAU 168 over SR-168 / SR-1 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does FAU 168 over SR-168 / SR-1 carry?
About 10,098 vehicles per day (2021 count), of which roughly 6% are trucks.
How long is FAU 168 over SR-168 / SR-1?
The structure is 115 ft (35.1 m) long with a longest span of 57 ft (17.5 m) and a deck 35 ft wide.
Who owns FAU 168 over SR-168 / SR-1?
It is owned by the State Highway Agency.