WB Frontage Rd. over I40-WB-RMP / Papermill
GoodKnox County, Tennessee · North Side of I40 · Structure no. 47I00400191
- Built
- 2005
- 20 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 347 ft
- 3 main spans
- Daily traffic
- 182,502
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
WB Frontage Rd. over I40-WB-RMP / Papermill is a steel continuous stringer/multi-beam or girder carrying WB Frontage Rd. over I40-WB-RMP / Papermill in Knox County, Tennessee. It was built in 2005, so it is 20 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 182,502 vehicles a day, roughly 6% of them trucks, projected to reach 344,352 by 2041. The structure is 347 ft (105.7 m) long and 40 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was WB Frontage Rd. over I40-WB-RMP / Papermill built?
It was built in 2005, making it 20 years old in 2025.
What condition is WB Frontage Rd. over I40-WB-RMP / Papermill in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does WB Frontage Rd. over I40-WB-RMP / Papermill carry?
About 182,502 vehicles per day (2021 count), of which roughly 6% are trucks.
How long is WB Frontage Rd. over I40-WB-RMP / Papermill?
The structure is 347 ft (105.7 m) long with a longest span of 124 ft (37.9 m) and a deck 40 ft wide.
Who owns WB Frontage Rd. over I40-WB-RMP / Papermill?
It is owned by the State Highway Agency.