FAS 218 over Overflow
FairPosted for loadHenry County, Tennessee · 3 MI E of Paris · Structure no. 40SR2180003
- Built
- 1988
- 37 years old
- Condition
- Fair
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 346 ft
- 5 main spans
- Daily traffic
- 4,855
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAS 218 over Overflow is a prestressed concrete box beam or girders - multiple carrying FAS 218 over Overflow in Henry County, Tennessee. It was built in 1988, so it is 37 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 4,855 vehicles a day, roughly 5% of them trucks, projected to reach 7,768 by 2042. The structure is 346 ft (105.5 m) long and 46 ft wide. If it were closed, the detour would be 18 mi (29 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 218 over Overflow built?
It was built in 1988, making it 37 years old in 2025.
What condition is FAS 218 over Overflow in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does FAS 218 over Overflow carry?
About 4,855 vehicles per day (2021 count), of which roughly 5% are trucks.
How long is FAS 218 over Overflow?
The structure is 346 ft (105.5 m) long with a longest span of 70 ft (21.3 m) and a deck 46 ft wide.
Who owns FAS 218 over Overflow?
It is owned by the State Highway Agency.