US Bridges

FAS 104 over SR-104 / I-40

Good

Henderson County, Tennessee · 1.2 MI W JCT SR104 · Structure no. 39I00400005

Built
2010
15 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
234 ft
2 main spans
Daily traffic
746
2021 count
Owner
State
State Highway Agency

About this bridge

FAS 104 over SR-104 / I-40 is a prestressed concrete continuous stringer/multi-beam or girder carrying FAS 104 over SR-104 / I-40 in Henderson County, Tennessee. It was built in 2010, so it is 15 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 746 vehicles a day, roughly 5% of them trucks, projected to reach 1,456 by 2040. The structure is 234 ft (71.3 m) long and 41 ft wide. If it were closed, the detour would be 37.3 mi (60 km).

CarriesFAS 104
CrossesSR-104 / I-40
Location1.2 MI W JCT SR104
RouteState Highway 104
Coordinates35.75488, -88.514
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69.3 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length234 ft (71.3 m)
Longest span118 ft (36.1 m)
Deck width41 ft (12.6 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic746 (2021)
Projected traffic1,456 by 2040
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed37.3 mi (60 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FAS 104 over SR-104 / I-40 built?

It was built in 2010, making it 15 years old in 2025.

What condition is FAS 104 over SR-104 / I-40 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does FAS 104 over SR-104 / I-40 carry?

About 746 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is FAS 104 over SR-104 / I-40?

The structure is 234 ft (71.3 m) long with a longest span of 118 ft (36.1 m) and a deck 41 ft wide.

Who owns FAS 104 over SR-104 / I-40?

It is owned by the State Highway Agency.