FAU 8 726098N over Southern Railway
FairPosted for loadHamilton County, Tennessee · 0.5 Mi. S of SR-29 Jct. · Structure no. 33SR0080011
- Built
- 1922
- 103 years old, rebuilt 1929
- Condition
- Fair
- inspected September 2024
- Type
- Tee Beam
- Concrete
- Length
- 33 ft
- 1 main span
- Daily traffic
- 23,097
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
FAU 8 726098N over Southern Railway is a concrete tee beam carrying FAU 8 726098N over Southern Railway in Hamilton County, Tennessee. It was built in 1922 and reconstructed in 1929, so it is 103 years old, older than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 23,097 vehicles a day, roughly 4% of them trucks, projected to reach 30,806 by 2041. The structure is 33 ft (10.1 m) long and 43 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 8 726098N over Southern Railway built?
It was built in 1922, making it 103 years old in 2025. It was reconstructed in 1929.
What condition is FAU 8 726098N over Southern Railway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does FAU 8 726098N over Southern Railway carry?
About 23,097 vehicles per day (2021 count), of which roughly 4% are trucks.
How long is FAU 8 726098N over Southern Railway?
The structure is 33 ft (10.1 m) long with a longest span of 33 ft (10.1 m) and a deck 43 ft wide.
Who owns FAU 8 726098N over Southern Railway?
It is owned by the State Highway Agency.