I75 SB over Spring Creek
FairHamilton County, Tennessee · I24 I75 Interchange · Structure no. 33I00750090
- Built
- 2021
- 4 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 129 ft
- 1 main span
- Daily traffic
- 110,752
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
I75 SB over Spring Creek is a prestressed concrete stringer/multi-beam or girder carrying I75 SB over Spring Creek in Hamilton County, Tennessee. It was built in 2021, so it is 4 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 110,752 vehicles a day, roughly 7% of them trucks, projected to reach 149,589 by 2042. The structure is 129 ft (39.4 m) long and 62 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I75 SB over Spring Creek built?
It was built in 2021, making it 4 years old in 2025.
What condition is I75 SB over Spring Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does I75 SB over Spring Creek carry?
About 110,752 vehicles per day (2021 count), of which roughly 7% are trucks.
How long is I75 SB over Spring Creek?
The structure is 129 ft (39.4 m) long with a longest span of 124 ft (37.9 m) and a deck 62 ft wide.
Who owns I75 SB over Spring Creek?
It is owned by the State Highway Agency.