US Bridges

S. Moore Rd. over I-24

Good

Hamilton County, Tennessee · 1 Mi.W.Of I-75 Jct. · Structure no. 33I00240059

Built
2024
1 years old
Condition
Good
inspected October 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
184 ft
2 main spans
Daily traffic
11,378
2021 count
Owner
State
State Highway Agency

About this bridge

S. Moore Rd. over I-24 is a prestressed concrete box beam or girders - single or spread carrying S. Moore Rd. over I-24 in Hamilton County, Tennessee. It was built in 2024, so it is 1 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,378 vehicles a day, roughly 4% of them trucks, projected to reach 18,205 by 2042. The structure is 184 ft (56.1 m) long and 91 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesS. Moore Rd.
CrossesI-24
Location1 Mi.W.Of I-75 Jct.
RouteCity Street 3578
Coordinates35.0063, -85.23182
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.2 US tons
Inventory rating42.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length184 ft (56.1 m)
Longest span93 ft (28.2 m)
Deck width91 ft (27.7 m)
Roadway width77 ft (23.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,378 (2021)
Projected traffic18,205 by 2042
Trucks4%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of relocation of road
Estimated improvement cost$4.4 million (2022 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was S. Moore Rd. over I-24 built?

It was built in 2024, making it 1 years old in 2025.

What condition is S. Moore Rd. over I-24 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does S. Moore Rd. over I-24 carry?

About 11,378 vehicles per day (2021 count), of which roughly 4% are trucks.

How long is S. Moore Rd. over I-24?

The structure is 184 ft (56.1 m) long with a longest span of 93 ft (28.2 m) and a deck 91 ft wide.

Who owns S. Moore Rd. over I-24?

It is owned by the State Highway Agency.